電磁閥安裝技術(shù)
發(fā)布時間:2014-11-25 19:41 已被瀏覽 次
電磁閥安裝技術(shù)
Electromagnetic valve installation techniques
電磁閥的安裝質(zhì)量的好壞直接影響使用后期電磁閥,閥門制造有限公司。上海,是電磁閥的專業(yè)生產(chǎn)廠家,下面是西安克萊斯自動化科技有限公司。一般的提示,以電磁閥的安裝技術(shù)總結(jié):
1,電磁閥的工作介質(zhì)應(yīng)清潔無雜質(zhì)顆粒,灰塵和過濾器表面上的電磁閥內(nèi)件,需要清潔定期。其次,電磁閥線圈若安裝,并保持垂直的位置,或者箭頭標(biāo)記在電磁閥應(yīng)該是,不應(yīng)將其安裝在與濺水或漏水的地方與管道相一致。
三,在安裝前的水利用電磁閥的電磁閥,管必須是干凈的。在閥的前面的濾光器的安裝是推薦的,蒸汽管道安裝蒸汽疏水閥。
四,電磁閥不能在爆炸危險中。
五,在管道系統(tǒng)中,安裝在電磁閥大小的分支應(yīng)小于主閥。
六,不能在閥內(nèi)安裝閥門在管道驟降,免得由于蒸汽冷凝水,雜質(zhì)沉淀和防止作用。
七,將電磁閥發(fā)生故障時,為了及時隔離電磁閥,并確保系統(tǒng)的正常操作中,最好安裝旁路裝置。
八,水電磁閥下剛性管道,推薦在閥管托之前使用,從而避免因振動在工作時引起的電磁閥。
第九,水分利用電磁閥應(yīng)之前和壓力計之后對管道進(jìn)行安裝,以觀察該管的壓力。
十,水用電磁閥安裝前,要注意看產(chǎn)品的標(biāo)志,請閱讀使用說明書,以確定產(chǎn)品是否符合使用條件。
Solenoid valve installation quality directly affect the use of the late solenoid valve, valve manufacturing co., LTD. Shanghai, is a professional manufacturer of solenoid valve, below is Shanghai valve manufacturing co., LTD. Technical summary of general tips to electromagnetic valve installation: one, the working medium of solenoid valve should be clean and no impurity particles, electromagnetic trims on the surface of the dirt and filters, need to clean on a regular basis. Second, the electromagnetic valve coil up when installation, and keep the vertical position, or arrow mark in the solenoid valve should be consistent with the piping to, shall not be installed in places with splashing water or water leakage. Three, water use solenoid valve solenoid valve before installation, the pipe must be clean. The installation of the filter in front of the valve is recommended, steam pipe installation steam trap. Four, the electromagnetic valves cannot be used in explosion hazard. Five, in the pipeline system, installed on the branch of the solenoid valve size should be less than the main valve. Six, can not install the valve in the pipeline dips, lest because of steam condensation water, impurities precipitation within the valve and prevent action. Seven, the electromagnetic valve failure occurs, in order to timely isolation solenoid valve, and ensure the normal operation of the system, the best install bypass device. Eight, water electromagnetic valve in the pipeline under rigid, recommend to use before the valve pipe bracket, so as to avoid electromagnetic valve caused by vibration while working. Ninth, water use electromagnetic valve should be installed on the pipeline before and after the pressure gauge, in order to observe the pipe pressure. Ten, water use electromagnetic valve before installation, pay attention to see the product sign, read the instruction for use, to determine whether a product conforms to the conditions of use.
國內(nèi)相關(guān)
電磁閥產(chǎn)品:/diancifa/
國外相關(guān)
進(jìn)口電磁閥產(chǎn)品:/fring/solenoidvalve/
【聲明】: 以上文章或資料除注明為西安克萊斯自動化科技有限公司自創(chuàng)或編輯整理外,均為各方收集或網(wǎng)友推薦所得。其中摘錄的內(nèi)容以共享、研究為目的,不存在任何商業(yè)考慮。
目前網(wǎng)站上有些文章未注明作者或出處,甚至標(biāo)注錯誤,此類情況出現(xiàn)并非不尊重作者及出處網(wǎng)站,而是因?yàn)橛行┵Y料來源的不規(guī)范。如果有了解作者或出處的原作者或網(wǎng)友,請告知,本網(wǎng)站將立即更正注明,并向作者道歉。
被摘錄的對象如有任何異議,請與本站聯(lián)系,聯(lián)系郵箱:a59168@126.com,本站確認(rèn)后將立即撤下。謝謝您的支持與理解!